Difference between revisions of "Thursday, Mar. 03: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 7: Line 7:
 
* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 
* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
 
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
Bdl vs. current (decreasing magnet 375A->0A by 25A)
+
Bdl vs. current (decreasing magnet 375A->0A by 25A)<br>
 
- <b>No controlled access !</b><br>
 
- <b>No controlled access !</b><br>
 
Once RF recovery is done, <br>
 
Once RF recovery is done, <br>

Revision as of 10:27, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
    • After reconstructed optics beam line, we had 10uA for some production runs during OWL.

Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
Bdl vs. current (decreasing magnet 375A->0A by 25A)
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Experts will perform this (Dave/Julie/Thir/...) - Calo. HV off
Instruction:
DOC1DOC2
3/ Set up beam through Compton chicane
- Dave starts to turn on laser for warming up
4/ Production Data with stable beam current


  • Detailed instructions here



Upcoming event(Long Term)

  • Beam study (Thursday, 3/10)
  • Target boiling test (60uA)


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++