Go back to Daily Run Plan [[Daily Run Plans]]
+
Go back to Daily Run Plan [[Daily Run Plans]]<br>
 +
 
 
<b>Previously...</b>
 
<b>Previously...</b>
 
** Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
 
** Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
Line 24: Line 25:
 
- Dave starts to turn on laser for warming up<br>
 
- Dave starts to turn on laser for warming up<br>
 
4/ Production Data with stable beam current<br>
 
4/ Production Data with stable beam current<br>
 +
 +
  
  
Line 31: Line 34:
 
* Beam study (Thursday, 3/10)
 
* Beam study (Thursday, 3/10)
 
* Target boiling test (60uA)
 
* Target boiling test (60uA)
 +
 +
  
  

Revision as of 10:30, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

Previously...

    • Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
    • After reconstructed optics beam line, we had 10uA for some production runs during OWL.



Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
Bdl vs. current (decreasing magnet 375A->0A by 25A)
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target)
Instruction: DOC1DOC2
- Experts will perform this (Dave/Julie/Thir/...) - Calo. HV off
- If beam is not stable nor acceptable (30uA), we may skip this and go to 3/

3/ Set up beam through Compton chicane
- Dave starts to turn on laser for warming up
4/ Production Data with stable beam current




Upcoming event(Long Term)

  • Beam study (Thursday, 3/10)
  • Target boiling test (60uA)



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++