Difference between revisions of "Friday, Mar. 04: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Set up beam through Compton chicane * Production run ? <b>Specific mission</b> * Note: 1/ Agreement with Hall-D ...)
 
Line 12: Line 12:
 
<b>Specific mission</b>
 
<b>Specific mission</b>
 
* Note:
 
* Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
+
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)<br>
  - Crucial: high beam current 30uA with FC & empty target <br>
+
  - Crucial: high beam current 30uA(at least try) with FC & empty target <br>
  
 
Instruction:  
 
Instruction:  

Revision as of 09:41, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production run ?



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off

2/ Back to production mode


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++