Difference between revisions of "Wednesday, March 16, 2016 1:30pm EST"
From Hall A Wiki
(→Minutes) |
(→Minutes) |
||
Line 47: | Line 47: | ||
** what's next for the collimators? | ** what's next for the collimators? | ||
* Tasks for 2016 | * Tasks for 2016 | ||
− | ** | + | ** which JLAB engineers are going to be working on MOLLER stuff? |
+ | ** bid for prototype | ||
+ | ** main "background" collimator design | ||
+ | ** upstream torus design (water cooling, etc.) | ||
+ | ** other collimators | ||
+ | ** coil supports | ||
+ | ** collimator supports | ||
+ | * Next meeting two weeks, then the 13th | ||
+ | * MOLLER Collab. April 29-30 | ||
Latest revision as of 14:14, 16 March 2016
Last meeting: Wednesday, March 2, 2016 1:30pm EST
Agenda
- prototype coil
- status of collimator
Minutes
Attending: KK, Jason, Juliette, Jim, Ernie,
- prototype coil tests
- under SBU
- where?
- do at MIT Bates with SBU student/postdoc
- do at SBU with MIT folks traveling
- space for the prototype
- with 20 ton crane
- protoype coil cost ~$150k
- need a breakdown of what goes into that
- request a real bid
- need to put together a bid package
- what type of coil?
- hybrid, full scale
- hybrid, but shorter (same current densities, same cross-sections)
- simpler racetrack coil
- if shorter also could do Ernie's version also
- might not have a working coil if full size anyway
- need to "reduce risk"
- doing two shorter hybrid-like coils w/ the two different conductor cross-sections
- allows us to see if they can really produce bends
- allows us to see if one or the other cross-section works
- still allows us to test the bends
- change number of outlets so that we still end up with the same length water circuits
- if we built a full-size one it might not be a spare prototype anyway
- deadline of May 1
- collimator status
- temp limit 100 C
- pretty standard - no prototyping needing
- what's next for the collimators?
- Tasks for 2016
- which JLAB engineers are going to be working on MOLLER stuff?
- bid for prototype
- main "background" collimator design
- upstream torus design (water cooling, etc.)
- other collimators
- coil supports
- collimator supports
- Next meeting two weeks, then the 13th
- MOLLER Collab. April 29-30
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005