Difference between revisions of "Todo List"
From Hall A Wiki
(→EPICS & DAQ) |
|||
Line 9: | Line 9: | ||
# {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}} | # {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}} | ||
# Camera (Jin) Aborted | # Camera (Jin) Aborted | ||
− | # Spectrum analyzer (Yi) | + | # {{pass|Spectrum analyzer (Yi)}} |
# {{pass|Q-wave plate stepping motor (Jin)}} | # {{pass|Q-wave plate stepping motor (Jin)}} | ||
Line 26: | Line 26: | ||
== EPR System == | == EPR System == | ||
# EPR D2 assembly (Chiranjib/Yi) | # EPR D2 assembly (Chiranjib/Yi) | ||
− | # EPR RF Cable (Chiranjib/Yi') | + | # {{pass|EPR RF Cable (Chiranjib/Yi')}} |
== Spin Flip == | == Spin Flip == | ||
Line 32: | Line 32: | ||
# {{Pass|EPICS communication (Jin)}} | # {{Pass|EPICS communication (Jin)}} | ||
# {{Pass|Stepper Motor Commisioning (Jin)}} | # {{Pass|Stepper Motor Commisioning (Jin)}} | ||
− | # NMR Signal Acquisition (Yi/Jin/Chiranjib) | + | # {{pass|NMR Signal Acquisition (Yi/Jin/Chiranjib)}} |
# {{Pass|2nd Copy of Spin Signal (Jin)}} | # {{Pass|2nd Copy of Spin Signal (Jin)}} | ||
# VI update (Yi/Jin) | # VI update (Yi/Jin) |
Revision as of 08:49, 17 October 2008
Contents
Laser System
- Assemble COMET Lasers (Chiranjib/Yi)
- Move in a Rack to new target lab for COMET Lasers
- Interlock connections to Lasers (Mark/Yi)
- Interlock connections in the Hall (Mark/Yi)
- RTDs for Laser enclosure (Done by Yi'/Yi)
- RTDs to readout chassis for interlock (Yi')
- optics setup (Done by Chiranjib/Jin)
- Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
- Camera (Jin) Aborted
- Spectrum analyzer (Yi)
- Q-wave plate stepping motor (Jin)
Oven and Heater
- Heater Installation (Joe)
- Heater Control Box and connection (Joe)
- Oven temperature control RTD (Yi')
- RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)
NMR System
- Longitudinal RF Coil Connection (Yi')
- Pickup Coil Cables (Chiranjib/Yi')
- VI update (Jin/Yi)
- NMR Lock-in repair (Yi)
EPR System
- EPR D2 assembly (Chiranjib/Yi)
- EPR RF Cable (Chiranjib/Yi')
Spin Flip
- Test plan (Yi/Jin)
- EPICS communication (Jin)
- Stepper Motor Commisioning (Jin)
- NMR Signal Acquisition (Yi/Jin/Chiranjib)
- 2nd Copy of Spin Signal (Jin)
- VI update (Yi/Jin)
- Finish up Documentation (Yi/Jin)
- Target Worker Quick Training Material (Yi/Jin)
EPICS & DAQ
- Target IOC (Jack/Bryan/Yi/Jin)
- Targe EPICS Variable to Data Stream (Yi/Jin)
- Analyzer code for target state (Jin)
Holding Field
- Optimal Field determination (Yi')
- Correction Field Calculation (Yi')
- Correction Coil connection (Chiranjib/Yi')
Cell Installation
- Reference Cell (Joe/Todd)
- He3 Cell (Joe)