Difference between revisions of "Transversity/Online HowTo"
From Hall A Wiki
Line 1: | Line 1: | ||
Here is shift index page of workder HowTo for experiment [[transversity]]. | Here is shift index page of workder HowTo for experiment [[transversity]]. | ||
− | * [[Transversity/Online Replay|Replay | + | == Gerneral == |
− | + | ||
+ | * [[Transversity/Online Replay|Data Replay]] | ||
* [[Experts On-Call]] | * [[Experts On-Call]] | ||
+ | * Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/ | ||
+ | |||
+ | == Detectors == | ||
+ | |||
* [[High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)]] | * [[High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)]] | ||
* [[Change Wire Chamber Threshold]] | * [[Change Wire Chamber Threshold]] | ||
* [[How to set BigBite Total Shower thresholds]] | * [[How to set BigBite Total Shower thresholds]] | ||
− | * | + | |
+ | == Polarized He3 Target == | ||
+ | |||
+ | * [[Spin Flip/Shift Worker Quick Start|Spin Flip System]] | ||
== Run sheets and shift checklist == | == Run sheets and shift checklist == |
Revision as of 23:04, 22 October 2008
Here is shift index page of workder HowTo for experiment transversity.
Gerneral
- Data Replay
- Experts On-Call
- Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/
Detectors
- High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)
- Change Wire Chamber Threshold
- How to set BigBite Total Shower thresholds
Polarized He3 Target
Run sheets and shift checklist
Commissioning run sheet ps file and tex file