* Take a run at the following kinematics without the sieve-slit collimator. | * Take a run at the following kinematics without the sieve-slit collimator. | ||
− | * Start with initial | + | * Start with initial HRS spectrometer tunes for the left and right arms with the new quads in place of Q1s. |
* If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure. | * If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure. | ||
* Electron rates assume 9 out of 11 carbon foils, 5 mSr acceptance, and 8% delta acceptance. | * Electron rates assume 9 out of 11 carbon foils, 5 mSr acceptance, and 8% delta acceptance. | ||
Line 10: | Line 10: | ||
* This process will be repeated until the spectrometer tune is satisfactory.<br> | * This process will be repeated until the spectrometer tune is satisfactory.<br> | ||
− | * <b> | + | * <b>Left-HRS Kinematics: 1st Pass (E<SUB>beam</SUB> = 2.2 GeV)</b> <br> |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> |
Revision as of 12:59, 8 October 2016
Procedure without Sieve-slit
- Kinematics need to be updated!
- Time estimate: 1-2 hours
* Take a run at the following kinematics without the sieve-slit collimator. * Start with initial HRS spectrometer tunes for the left and right arms with the new quads in place of Q1s. * If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure. * Electron rates assume 9 out of 11 carbon foils, 5 mSr acceptance, and 8% delta acceptance. * A GMp expert will check the data quality and decide, if the right HRS tune needs to be adjusted to change the size of the acceptance. * This process will be repeated until the spectrometer tune is satisfactory.
- Left-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Q2 [GeV2] | W [GeV] | Rate [Hz] at 20 μA | minutes for 71k events at 20 μA |
2.217 | 0.85 | 48.75 | 1.28 | 1.47 | 119 | 10 |
We want to take runs with the following Q1 currents:
- 0%: 159.75 A
- -6%: 150.165 A
- -5%: 151.7625 A
- -4%: 153.36 A
- -3%: 154.9575 A
- +5%: 167.7375 A
- Right-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Q2 [GeV2] | W [GeV] | Rate [Hz] at 20 μA | minutes for 71k events at 20 μA |
2.217 | 0.85 | 48.75 | 1.28 | 1.47 | 119 | 10 |
We want to take runs with the following Q1 currents:
- 0%: 159.75 A
- -6%: 150.165 A
- -5%: 151.7625 A
- -4%: 153.36 A
- -3%: 154.9575 A
- +5%: 167.7375 A