Difference between revisions of "Transversity/Online HowTo"

From Hall A Wiki
Jump to: navigation, search
(Run sheets and shift checklist)
Line 12: Line 12:
 
* [[Change Wire Chamber Threshold]]
 
* [[Change Wire Chamber Threshold]]
 
* [[How to set BigBite Total Shower thresholds]]
 
* [[How to set BigBite Total Shower thresholds]]
 +
* [[BigBite Wire Chamber Trip Recover Procedure]]
  
 
== Polarized He3 Target ==
 
== Polarized He3 Target ==

Revision as of 23:03, 1 November 2008

Here is shift index page of worker HowTo for experiment transversity.

Gerneral

Detectors

Polarized He3 Target

Run sheets and shift checklist

Commissioning run sheet ps file and tex file

Production run sheet ps file and tex file

Shift checklist ps file and tex file