Difference between revisions of "SBS 2017 GMn Experimental Readiness Review Preparation"

From Hall A Wiki
Jump to: navigation, search
m
Line 21: Line 21:
 
| 9:00  ||          Remarks from Chair and Charge      ||            Chair  (10)
 
| 9:00  ||          Remarks from Chair and Charge      ||            Chair  (10)
 
|-  
 
|-  
| 9:10  ||        '''Charge Item 5,5c''':  Overview, general requirements    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/B_Quinn_ERR_dryrun_2.pdf pdf])              ||        Brian Quinn (15+10)               
+
| 9:10  ||        '''Charge Item 5''':  Overview, general requirements    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/B_Quinn_ERR_dryrun_2.pdf pdf])              ||        Brian Quinn (15+10)               
 
|-
 
|-
 
| 9:35  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMN-ERR-M-Jones.pdf pdf])  ||      Mark Jones (20+20)       
 
| 9:35  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMN-ERR-M-Jones.pdf pdf])  ||      Mark Jones (20+20)       
Line 49: Line 49:
 
|15:25  ||    '''Charge Item 3,5a''': Software; GEM reconstruction efficiency at high rate ([https://anl.box.com/shared/static/k75o7sg8oelsg57ivwv2qkbhf0eke8o9.pdf pdf])  ||    Seamus Riordan (30+20)
 
|15:25  ||    '''Charge Item 3,5a''': Software; GEM reconstruction efficiency at high rate ([https://anl.box.com/shared/static/k75o7sg8oelsg57ivwv2qkbhf0eke8o9.pdf pdf])  ||    Seamus Riordan (30+20)
 
|-
 
|-
|16:15  ||    '''Charge Item 4''': Target, scattering chamber, and radiator  ||    Keith or Meekins (15+5)  
+
|16:15  ||    '''Charge Item 4''': Target, scattering chamber, and radiator  ||    David Meekins (15+5)  
 
|-
 
|-
 
|16:35  ||    '''Charge Item 5b''': High trigger rate capabilities. What are the expected accidentals? ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMn%20experiment%20ERR.pdf pdf] [http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMn%20experiment%20ERR.pptx pptx]) ||    Alexandre Camsonne (15+15)
 
|16:35  ||    '''Charge Item 5b''': High trigger rate capabilities. What are the expected accidentals? ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMn%20experiment%20ERR.pdf pdf] [http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMn%20experiment%20ERR.pptx pptx]) ||    Alexandre Camsonne (15+15)

Revision as of 18:44, 1 June 2017

Overview

Super Bigbite

Experimental Readiness Review 2017

Time and Location

  • Date: 15-16 June 2017 (Thursday/Friday)
  • Location: L102
  • ERR Committee Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation)

Dave Gaskell (Beam line/Target) chair; Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)

  • ERR Charge (pdf)

Draft Agenda

Thursday Morning
8:30 Closed Session , (30)
9:00 Remarks from Chair and Charge Chair (10)
9:10 Charge Item 5: Overview, general requirements (pdf) Brian Quinn (15+10)
9:35 Charge Item 1,5: Apparatus ownership, maintenance and control;
Equipment to achieve the scientific goals; Safety Docs (pdf)
Mark Jones (20+20)
10:15 Break (15)
10:30 Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware (pdf) Robin Wines (30+15)
11:15 Charge Item 2,3: HCal Gregg Franklin (15+5)
11:35 Charge Item 5c: HCal efficiency calibration (pdf) Brian Quinn (10+5)
11:50 Charge Item 2,3: Bigbite non-GEMs (pdf) Todd Averett (20+15)
12:25 Working Lunch
Afternoon
13:30 Charge Item 2,3: GEMs (pdf) Nilanga Liyanage (20+20)
14:10 Charge Item 2,3: CDet (pdf) Peter Monaghan (15+5)
14:30 Charge Item 2: Installation (pdf) Jessie Butler (20+20)
15:10 Break (15)
15:25 Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (pdf) Seamus Riordan (30+20)
16:15 Charge Item 4: Target, scattering chamber, and radiator David Meekins (15+5)
16:35 Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (pdf pptx) Alexandre Camsonne (15+15)
17:05 End
Friday Morning
9:00 Charge Item 6,7: fringe field effects; Beam commissioning / machine protection (pdf) Jay Benesch (15+15)
9:30 Charge Item 8: radiation levels, local shielding; RSAD (pdf) Andrew Puckett (20+20)
10:10 End
x:xx Closed Session
13:00 Close Out
Draft of COO (APEX's pdf)
Draft of ERG (APEX's pdf)
Draft of ESAD (APEX's pdf)
Input for RSAD from Radcon (radiation budget form) (APEX's pdf)