Difference between revisions of "SBS 2017 GMn Experimental Readiness Review"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
Line 21: Line 21:
 
| 9:00  ||          Remarks from Chair and Charge      ||            Chair  (10)
 
| 9:00  ||          Remarks from Chair and Charge      ||            Chair  (10)
 
|-  
 
|-  
| 9:10  ||        '''Charge Item 5''':  Overview, general requirements    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])              ||        Brian Quinn (15+10)               
+
| 9:10  ||        '''Charge Item 5''':  Overview, general requirements    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/B_Quinn_ERR_intro_Charge_5.pdf pdf])              ||        Brian Quinn (15+10)               
 
|-
 
|-
 
| 9:35  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMN-ERR-M-Jones.pdf pdf])  ||      Mark Jones (20+20)       
 
| 9:35  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMN-ERR-M-Jones.pdf pdf])  ||      Mark Jones (20+20)       
Line 31: Line 31:
 
|11:15  ||    '''Charge Item 2,3''': HCal ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCAL_GMn_ERR_Jun_2017.pdf pdf])  ||      Gregg Franklin (15+5)  
 
|11:15  ||    '''Charge Item 2,3''': HCal ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCAL_GMn_ERR_Jun_2017.pdf pdf])  ||      Gregg Franklin (15+5)  
 
|-
 
|-
|11:35  ||    '''Charge Item 5c''': HCal efficiency calibration ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Brian Quinn (10+5)  
+
|11:35  ||    '''Charge Item 5c''': HCal efficiency calibration ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/B_Quinn_ERR_charge_5c.pdf pdf])  ||      Brian Quinn (10+5)  
 
|-
 
|-
 
|11:50  ||    '''Charge Item 2,3''': Bigbite non-GEMs  ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMN_ERR_Averett_15-Jun-2017.pdf pdf])  ||      Todd Averett (20+15)  
 
|11:50  ||    '''Charge Item 2,3''': Bigbite non-GEMs  ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMN_ERR_Averett_15-Jun-2017.pdf pdf])  ||      Todd Averett (20+15)  

Revision as of 18:53, 13 June 2017

Overview

Super Bigbite

Experimental Readiness Review 2017

  • Date: 15-16 June 2017 (Thursday/Friday)
  • Location: L102
  • ERR Committee Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation),

Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q),

Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)

  • ERR Charge (pdf)

Agenda

Thursday Morning
8:30 Closed Session , (30)
9:00 Remarks from Chair and Charge Chair (10)
9:10 Charge Item 5: Overview, general requirements (pdf) Brian Quinn (15+10)
9:35 Charge Item 1,5: Apparatus ownership, maintenance and control;
Equipment to achieve the scientific goals; Safety Docs (pdf)
Mark Jones (20+20)
10:15 Break (15)
10:30 Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware (pdf) Robin Wines (30+15)
11:15 Charge Item 2,3: HCal (pdf) Gregg Franklin (15+5)
11:35 Charge Item 5c: HCal efficiency calibration (pdf) Brian Quinn (10+5)
11:50 Charge Item 2,3: Bigbite non-GEMs (pdf) Todd Averett (20+15)
12:25 Working Lunch
Afternoon
13:30 Charge Item 2,3: GEMs (TBD) Nilanga Liyanage (20+20)
14:10 Charge Item 2,3: CDet (pdf) Peter Monaghan (15+5)
14:30 Charge Item 2: Installation (pdf) Jessie Butler (20+20)
15:10 Break (15)
15:25 Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (pdf) Seamus Riordan (30+20)
16:15 Charge Item 4: Target, scattering chamber, and radiator (pdf) David Meekins (15+5)
16:35 Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (pdf pptx) Alexandre Camsonne (15+15)
17:05 End
Friday Morning
9:00 Charge Item 6,7: fringe field effects; Beam commissioning / machine protection (pdf) Jay Benesch (15+15)
9:30 Charge Item 8: radiation levels, local shielding; RSAD (TBD) Andrew Puckett (20+20)
10:10 End
x:xx Closed Session
13:00 Close Out
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
Input for RSAD from Radcon (radiation budget form) (pdf) and (pdf)
Draft of OSP for GEM detectors (pdf)
Draft of OSP for BigBite magnet (pdf)
Draft of OSP for BigBite rotation (pdf)
Draft of OSP GRINCH Cherenkov detector (pdf)
Draft of OSP for BigBite timing hodoscope (pdf)
Draft of OSP for Hadron Calorimeter, HCal-J (pdf)
Draft of OSP for Coordinate Detector, CDet (pdf)