Revision as of 10:57, 14 August 2020
Back to SuperBigBite
Bluejeans
https://bluejeans.com/596873830/?src=calendarLink
Contents
- 1 August 14th 2020
- 2 July 31st 2020
- 3 July 24th 2020
- 4 July 10th 2020
- 5 June 26th 2020
- 6 June 19th 2020
- 7 June 12th 2020
- 8 March 27th 2020
- 9 March 13th 2020
- 10 February 14th 2020
- 11 February 7th 2020
- 12 January 24th 2020
- 13 December 13th 2019
- 14 November 22th 2019
- 15 October 25th 2019
- 16 October 4th 2019
August 14th 2020
July 31st 2020
- Updates
- MPD issues with high speed : will discuss it at GEM meeting on Wednesday
- Bigbite : need to make sure all sessions are correct, will try again
Glasgow could fund 6 to 8 FADCs - Got quote from Chris Cuevas : 6.2 K$ for 16 units and 5.9K for 25 units about 48 K$
- CDet : bid process was finished, will start ordering VETROC - Catagna is buying the VXS crate
- GRINCH : can log in the computer - still need to turn on detector - GRINCH is open right now
July 24th 2020
- Updates
- APV25 SSP setup : Ben debugging the system, optical signal looks ok
so maybe SSP firmware bug.
8 to 9 KHz
Jitter on signal might be because of clock power noisy
might be able to modify board
- HCAL : enpcamsonne, CODA 2.6 still running, can stop them for CODA install, Bryan installed JAVA required, so ready to install CODA3. Bryan updated scripts so they can easily be ported to other hosts.
- Bigbite : CODA can working, need to look at setup for trigger - Add vncserver to tedbbdaq
- CDet : David trying to install CODA3
July 10th 2020
- HCAL : can use DVCS pulser ? Can give delay
3 outputs from TI to control the LED Good time to put VXS crate ? DAQ running
- GEM : Xinzhan still check for status, checking the code
Ben : test in clean room, low voltage turned off
- Bigbite : still need to check if DAQ running after it was turned on, Bryan has all informations for shower DAQ
- GRINCH : still cannot connect to VME, will power cycle it
- Setup remote power cycling
- HCAL timing : need timing scheme for coincidence HCAL Bigbite
- Hodoscope : 64 channels V792 for calibration runs
June 26th 2020
- APV25 GEM update
- Xinzhan working with Danning, submitted access request last week
- Bigbite : try to reboot everything so can work remotely
need to send busy from V792
- CDet : write-up by Kara
- Plan for GEM with Nilanga : Krishna Kumar can help with GEM DAQ , Chandan could help with design of shielding hut, Hanie could work on BigBite GEM DAQ in TEDF
Need electronics for UV chamber, 10 K$ of APV card ( 150 chips left at UVA)
Most likely INFN + UV not fit in stack.
For UV readout need APV25 or adapter
For next week : Turn/reboot TEDF crates 3r DAQ GEM for GEM UMass postdoc for shield house and BigBite GEM DAQ
June 19th 2020
- VETROC discussion and introduction. VETROC can take any differential signal so existing.
Existing current firmware only uses front pannel : good enough for testing. Will eventually merge triggered firmware and high resolution firmware. Once ready will switch to it. No student allowed at JLab will try to setup a VME VETROC DAQ system at CNU.
VETROC manual at :
https://coda.jlab.org/drupal/system/files/pdfs/HardwareManual/vfTDC/vfTDC.pdf
- BPM/BCM : short discussion
- HCAL : need to turn on crates so can send readout list to Bryan
- Hodoscope : same as HCAL
June 12th 2020
First meeting after going back to Medcon5
Agenda
1) Near term BB DAQ to support the PReshower/Shower after install of new preshower blocks.
2) Setting up the final BB DAQ with integration of all detectors.
- Shower
- Need to add sums and TDC informations
- 1 week of cosmics before finalizing DAQ
- finalize DAQ after ( CODA3 - TS ) Let Bryan know the computer for CODA3
- Timing hodoscope
- Timeline
- GRINCH : update to CODA3 first
- Shower Fastbus
- Hodoscope
- GEM DAQ : 1 layer soon - need GEM 3rd DAQ setup ? INFN DAQ moved to TEDF
all subsystems give info to Bryan
3) Replacing the CDET fastbus TDc setup with an VME based TDC setup.
4) HCAL plan : switch VME64X to VXS
2 weeks of data - after switch CODA3 and VXS - addditionnal FADC for reference channel
5) Beamline readout for SBS : scalers for BCM, FADC for BPMs / raster , try digital readout in parallel ?
Use event blocking ?
If large event size - event blocking might not help
Readout of scalers - decoding might get broken -
6)
March 27th 2020
First meeting after JLAB to Medcon6
- Status
- HCAL
Scott looking at g4sbs simulation. Everything is off, besides enpcamsonne for files. Might install CODA3. Implementing different timing measurement : 1/4 peak height might not work for cosmics ( too small ), might try implement constant fraction algorithm.
- CDet : HV off , PS Nino off, Not sure if Fastbus is off, computer sbs2 still on for analysis.
- Bigbite : everything is off besides computer tedbbdaq. Not sure about Grinch. Had to turn on network switch
- Hodoscope: crate off - maybe work om software analysis - add V792 for calibration - Rachel will coordinate with
- GEM UVA : All electronics in EEL cleanroom off - computer still on - eel124gemdaq . Not sure if silo working.
- Task that can be done remotely
- mostly CODA3 install and decoding analysis software
March 13th 2020
- Status subsystems:
- HCAL ( Scott ) : timing studies pdf - maybe cable length
- switch to VXS crate - PMT greasing - needs to know if Juan Carlos can help
- HCAL CODA crashing almost every end of run : maybe loss of synchronization - errors message: https://logbooks.jlab.org/entry/3803365
Bogdan : possible AC pickup - check with LED
- CDET: start running test of Fastbus TDC, one crate for cosmics and one for testing. CNU cancels face to face courses for next 4 weeks
- GEM readout : issues on MPD, fixed firmware, up to 8 units, Danning continue scaling to 32 MPDs
February 14th 2020
- Event blocking in analyzer
- https://redmine.jlab.org/projects/podd/wiki
- https://github.com/JeffersonLab/analyzer/blob/master/hana_decode/PipeliningModule.cxx
- https://github.com/JeffersonLab/analyzer/blob/master/hana_decode/Fadc250Module.h
- Proposal by Bryan : class to handle the event buffer and index the buffer to have access to each part of the buffer
- https://github.com/JeffersonLab/simple
- https://coda.jlab.org/drupal/filebrowser/download/724954 evio format
- HCAL : Scott still working on timing resolution, reach 0.5 ns for most tubes, FADC timing resolution at 2.5 ns level, should be able to be improved
February 7th 2020
- Updates
- HCAL status( slides by Scott pdf )
Timing resolution about 0.8 ns, time walk correction done, JLab tubes don't have enough gain : change range to 0.5V for FADC, can add amplifier, estimation of the number of photoelectrons ( maybe around 5 to 8 per MeV )
- CDet ( Peter ) : met with Brad and Bodgan , start testing all TDC modules in the Fastbus crates, figure out if we have all the cables, test cables we have on hand. Cover at least half of detector 1200 channels of TDCs.
- GEM SSP readout (Danning / Ben ) : issue with MPD firmware fixed, need SSP firmware update : first version tested and had issue, EEL clean room : large setup ready to test (28 + 7 = 35 MPDs)
MPD current draw : need to have number to make sure crate can provide enough 5V current
- GRINCH ( Bradley ) : getting started with CODA3, DAQ with cosmics no crash lately, might happen for longer run and higher rate, still want to update to latest VETROC firmware and driver
- hodoscope ( Rachel ) : V1190 TDC setup , CODA 2.6.2 setup, add a V792 for calibration, setup detector to look at real signal
- Bigbite ( Mark ) : need to get started on CODA3 and TS, need to make sure TS CPU boots up.
- CAEN HV : try CAEN software, check with Steve to see what they have in Hall C
- GRINCH trigger : with VTP/GTP at level of at least 200 ns might fit in 500 ns delay line
January 24th 2020
- Updates
- HCAL status : second half cable and working, some TDC not firing with FADC signal ( just for new half ), new scintillator trigger paddle, energy threshold study with cosmics, working on timewalk correction, need PMT from calibration soon. FADC could induce DC offset. will check with scope
- GEM INFN : INFN DAQ still needs to check the isssue with MPD 17
- GEM SSP readout ( Ben ) : issue with MPD firmware , Paolo had to fix, now working with new data format , being tested right for 12 MPDs, scaling to 32.
- GRINCH DAQ crashing : no progress - need Bradley to contact Bryan
- Bigbite ( Mark ) : VXS crate installed for TS
- Gmn DAQ tasks : need to be ready January 2021
- GEM readout : SSP ( VTP ?) about 1 month February
- Switch CODA3 HRS, Bigbite, GRINCH, HCAL ( next two weeks )
- TS for bigbite ( try finish end of January )
- GEp DAQ tasks
- geometrical correlation ECAL HCAL
- HCAL trigger two crates
- Fast clear GEM
- Bigbite no Fastbus
- No Edet, only shower on Fastbus : 243 channels = 16 FADC
- VXS and VTP available from SoLID
- if no FADC in HRS and no Compton : 3 FADC HRS - 2 FADC compton - currently have 15 total with FADC on loan from electronics group - SoLID needs 100 modules
December 13th 2019
- GEp DAQ layout
https://hallaweb.jlab.org/wiki/images/c/c1/SBS_GEp_DAQ_Timing.pdf
- GMn / Bigbite DAQ layout
https://hallaweb.jlab.org/wiki/images/6/61/BBGlobalScheme_prel.pdf
https://userweb.jlab.org/~efuchey/SBS_BB/Pictures/BBweldment_fulllayout-Real_weldment_1-4.pdf
https://userweb.jlab.org/~efuchey/SBS_BB/Pictures/BBweldment_fulllayout-Real_weldment_5-8.pdf
- Updates
- INFN GEM
Isue with MPD 7 , when masked issue goes to another MPD
- HCAL : all channels cabled, 1st half all issues fixed. Setting up for cosmics, test turn on all FADC and TDCs did not crash !
- UVA GEM : old SSP firmware running with one SSP, ready testing new SSP firmware ( 16 MPDs ) , use cosmics
November 22th 2019
- HCAL status
- debugging old half, 6 channels have issues - TDC or discriminator issues maybe for 4 of them - 2 might be related to VME slot ? -
look with Bryan's decoder located in /site/coda/contrib/devel/dataDecode - if really looks like hardware issue can use VME bus analyzer
- Ben setup the FADC gui - will be useful for FADC/detector debugging - Scott will write some documentation on wiki
- start cabling other half of detector maybe next week
- control pulser - use L1A to trigger LED, or use a VME pulser ( will try to give a DVCS LED board to Juan Carlos )
- Grinch
- DAQ issues - crashing for long runs
- need to investigate - maybe check event size
- BigBite
- need new TS crate to check the final timing
- takes about to generate Shower trigger : 60 ns cable + 60 ns logic + cable 25 m = 100 ns ~ 250 ns
October 25th 2019
- Detectors DAQ status
- BigBite
- ADCs working fine running with CODA 2
- signals from all shower preshower channels
- can look at data with scripts
- add TDCs to setup (27x7 + 2x27 ) = 243 channels, only sums so 52 channels ( 1 x 1877S )
- try CODA3
- BigBite
- HCal
- FADC and F1 all running on HCAL
- resolution checks, not good right now, might be due to discriminator ( Phillips 715 )
- looking at cosmics
- all cables for second half of HCAL
- still unlock error on 1 TDC , need try lower resolution
- still on CODA2
- HCal
- CODA3 testing (Bob) pdf
- decoder in Podd can figure out if CODA3 or CODA2 data so should be transparent to SBS online library
- trigger data not decoded yet
- Eric tried CODA3 at beginning but still need some work for Fastbus
- Need CODA3 for VTP
- ATOM CPU testing
- does not work out from the box
October 4th 2019
- Bigbite DAQ status ( Eric )
- slide here pdf
- taking data but timing needs to be done to look at detector signals
- Eric should look at existing PODD classes for shower to decode Fastbus
- Shower trigger : less than 200 ns
- test trigger lines : 190 ns might
- HCAL DAQ status ( Scott )
- 2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
- - see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates )
- - resolution lock issue with F1, might be overheating
- - add blanks to improve cooling
- - reduce resolution of F1 to see if problem goes away
- - latency from TI ( OT2 is prompt output less delay down to 200 ns)
- UVA GEM status (Bryan / Kondo )
- - 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver
- - using CODA3
- - wiki with information on wiki : SBS_DAQ:_GEM_EEL_Cleanroom_setup
- - computer ready soon
- - 3rd (VXS) crate with SSP and MPDs
- SSP readout ( Ben )
- - 16 MPD for 1 SSP to be tested
- - all transceiver and fibers on site
- - test radiation hardness of transceivers and fibers
- BCM digital :
- - daughter board design done, need to make prototypes and test
- Certification of electronics : need to check with Ed Folts ( Nilanga question )
- CDet
- All TDC for coordinate in weldment : need checks ?
- Software : running DAQ CODA and root scripts to analyze, need to check if other functionalities needed. Library can be loaded in Hall A / SBS analyzer
- amount of TDCs for CDet sufficient
- 25 TDCs - need to check with Bob