Difference between revisions of "Meeting 2021 03 03"
From Hall A Wiki
(→TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean)) |
|||
Line 22: | Line 22: | ||
=== TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) === | === TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) === | ||
− | * | + | *[https://hallaweb.jlab.org/wiki/images/6/6f/BB_DAQ_3_3_21.pdf BB UVa GEM DAQ Update] |
=== Update from cosmic data (Malinga & Thir) === | === Update from cosmic data (Malinga & Thir) === |
Revision as of 10:55, 3 March 2021
GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am
Link to all previous meetings: GMn GEM Commissioning Meeting
Contents
- 1 GEM setup for GEN-RP plans (Brad)
- 2 Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel)
- 3 Update on UVa GEM commissioning (Kondo & Anu)
- 4 TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean)
- 5 Update from cosmic data (Malinga & Thir)
- 6 Update on the Tracking efficiency / resolution (Andrew)
- 7 Update on the High rate DAQ development (Ben, Alex, Paolo, Holly, Sean)
GEM setup for GEN-RP plans (Brad)
Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel)
Update on UVa GEM commissioning (Kondo & Anu)
- From Brad's email:
- Walt Akers has confirmed that the largest GEM frame can be moved to the EEL/124 cleanroom as soon as it's ready. (The two smaller frames stay in the ESB as planned).
- The base alignment spacers (large frame) we were given from Hall A are not the correct height. Check with Chris the designer if can correct this (Status?).