Difference between revisions of "Pol He-3 Target Information GEn"

From Hall A Wiki
Jump to: navigation, search
(Target Operator Instructions)
(Checklists)
Line 16: Line 16:
 
* [[Backout Checklist after Hall Access for Target Work ]] REVIEW THIS PAGE
 
* [[Backout Checklist after Hall Access for Target Work ]] REVIEW THIS PAGE
 
* [[Backout Checklist after Target Work inside Enclosure ]] REVIEW THIS PAGE
 
* [[Backout Checklist after Target Work inside Enclosure ]] REVIEW THIS PAGE
 +
* [[Checklist for each shift]]
  
 
== Target Polarization ==
 
== Target Polarization ==

Revision as of 03:42, 15 October 2022

Experiment Information

Target Operator Instructions

Checklists

Target Polarization

Measurements UPDATE FOR GEn!!

Target Meetings

Weekly Meetings

Expert Instructions

Target Cell

Reference Cell

Operating Procedures

Cooling Jet Alignment

Pol He3 Field Mapping Data

Pol He3 Field Map from TOSCA simulation

Circular Raster Information

Reboot Switches

Reset Target Ladder Motion Control

Cable/RTD/Signal Maps

Fiber RTD hardware trip points

PolHe3 Alarm Handler defaults

Reference Cell Information

  • Documents from Todd?

Production Target Cell Information

General Specifications for Target Cells

documents from Gordon?

Currently Installed Cell

  • Hunter
    • Installed in target: 10/14/2022

Cells Being Readied for Installation

  • Pristine
    • Undergoing tests at UVA
  • Windmill
    • Undergoing tests at UVA

Older Installed Cells

  • Ukraine
    • Installed in target: 10/03/2022 to 10/13/2022
    • Used for commissioning
    • Characterization Document:

Addition Documentation

information on study of magnetic field alignment in cells?

Additional Documentation

Target CAD Files/Photos

  • Selected Target Shop Drawings

Target Ladder

Information on Carbon Foils

Safety Documents

OSP for Magnetic Field Measurments

OSP for Polarized He3 Target

Manuals