Difference between revisions of "SBS 2022 ALL Experimental Readiness Review"
From Hall A Wiki
(→FINAL REPORT) |
(→FINAL REPORT) |
||
Line 28: | Line 28: | ||
=='''FINAL REPORT'''== | =='''FINAL REPORT'''== | ||
− | + | [https://hallaweb.jlab.org/wiki/images/8/8e/E12_21_005_ERR_Report.pdf ERR Report] | |
=='''Agenda'''== | =='''Agenda'''== |
Revision as of 12:04, 24 February 2023
Overview
Hall A E12-21-005 (Double Spin Asymmetry in Wide-Angle Charged Pion Photoproduction) Experiment Readiness Review
Experimental Readiness Review 2022
- Date: 18 May, 2022 (Wednesday)
- Location: L102/Remote
- Meeting link:
The zoom link for the remote connection is: https://jlab-org.zoomgov.com/j/1603893391?pwd=dGIrZzFGeENNSlI4ejUrVCt4bWRBUT09
- ERR Committee
- Pavel Degtiarenko (Radiation)
- Brian Eng (GEM)
- Graham Heyes (Computing)
- Doug Higinbotham (Chair)
- James Maxwell (Target)
- Yves Roblin (Beam Operation)
- Ed Folts (Observer)
- Rick Adrover (Observer)
- Adam Stavola (Observer)
- ERR Charge (pdf)
- Proposal (pdf)
- GEn ERR link (link)
- GEn and A_LL run plan (as of May 17th, 2022) (link)
FINAL REPORT
Agenda
Wednesday Morning | |||
8:00 | Closed Session | (20) | |
8:20 | Remarks from Chair and Charge | (5) | |
8:25 | Experiment Overview (link) | Bogdan Wojtsekhowski (10+10) | |
8:45 | Charge Item 1a & 1e: SBS beamline and radiator (pdf pptx) | Robin Wines (10+10) | |
9:05 | Charge Item 1b: Installations and spectrometer rotations (pdf) | Jessie Butler (10+10) | |
9:20 | Charge Item 1c: GEMs Installation pdf | Holly Szumila-Vance (10+10) | |
9:40 | Charge Item 6: Radiation levels (Radiation and shielding) | Eric Fuchey (10+10) | |
10:00 | Charge Item 1d: GEMs electronics pdf | Alex Camsonne (10+10) | |
10:20 | Charge Item 4: Data volume and computing resources (pdf) | Ole Hansen (10+10) | |
10:30 | Break | (10) | |
10:40 | Charge Items 1f & 2: 3He target status, Fringe fields, running configurations and polarization direction (pdf) | Gordon Cates (20+15) | |
11:15 | Charge Items 3 & 7: Manpower, responsibilities and documentation (pdf) | Arun Tadepalli (5+5) | |
11:25 | Charge Items 5: Simulations and data analysis preparedness (pdf) | Rachel Montgomery(15+10) | |
11:50 | Closed session | (45) | |
12:35 | Closeout | (45) | |
Afternoon Session | |||
COO (pdf) | |||
ERG (pdf) and chart (pdf) | |||
ESAD (pdf) | |||
Input for RSAD from Radcon (radiation budget form) (link) | |||
Draft of LOSP for pol3He target (pdf) | |||
Draft of OSP for pol3He target (pdf) | |||
OSP for GEM detectors (pdf) | |||
OSP GRINCH Cherenkov detector (pdf) | |||
OSP for BigBite timing hodoscope (pdf) | |||
OSP for Hadron Calorimeter, HCal-J (pdf) | |||
OSP for SBS motion and positioning , (pdf) | |||
OSP for SuperBigbite and Corrector Magnets' Power Supplies , (pdf) | |||
OSP for Moving BigBite Magnet and Detector Package , (pdf) |