Difference between revisions of "February 19th 2024"

From Hall A Wiki
Jump to: navigation, search
(Created page with "*Updates **Active polarimeter ***get cables ***setup cosmics triggers ***Wednesday cable the detectors **HCAL ***Jiwan gave the files to Ben ***first release of firmware with...")
 
 
Line 11: Line 11:
 
***need to take cosmics
 
***need to take cosmics
 
***need ePAS for hodoscope , will check with Arun
 
***need ePAS for hodoscope , will check with Arun
 +
**CDEt
 +
*** working on last module, soldering resistors and take more cosmics.
 +
*** work in Hall : waiting for Peter to have ePAS training, can start running cables in Hall
 +
*** HV computer still not online : waiting for hostname change
 +
***give connector to make adapter to VETROC
 +
*** TDC cable in ESB will be moved to CNU to put connectors
 +
*** discussion of location of low voltage ( in bunker behind ECal or somewhere else )

Latest revision as of 12:26, 19 February 2024

  • Updates
    • Active polarimeter
      • get cables
      • setup cosmics triggers
      • Wednesday cable the detectors
    • HCAL
      • Jiwan gave the files to Ben
      • first release of firmware with trigger and VTP readoout - can deploy this week
    • Hodoscope
      • meet to check detector and check with cosmics run
      • need to take cosmics
      • need ePAS for hodoscope , will check with Arun
    • CDEt
      • working on last module, soldering resistors and take more cosmics.
      • work in Hall : waiting for Peter to have ePAS training, can start running cables in Hall
      • HV computer still not online : waiting for hostname change
      • give connector to make adapter to VETROC
      • TDC cable in ESB will be moved to CNU to put connectors
      • discussion of location of low voltage ( in bunker behind ECal or somewhere else )