[[ Start up run plan]]: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.
 
[[ Start up run plan]]: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.
  
Friday Oct 1 Swing and Oct 2 Owl
 
================================
 
  
1) Compton rates with laser and beam scan (Eric will lead this study in the backroom)
+
== Friday Oct 1 Swing and Oct 2 Owl ==
  
2) While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong
+
<ol>
 
+
<li> Compton rates with laser and beam scan (Eric will lead this study in the backroom)</li>
3) [https://hallaweb.jlab.org/wiki/index.php/DVCS/BPMCalibration BPM calibration]
+
<li> While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong</li>
 
+
<li>[https://hallaweb.jlab.org/wiki/index.php/DVCS/BPMCalibration BPM calibration]</li>
4) [https://hallaweb.jlab.org/wiki/index.php/DVCS/RasterCalibration Raster calibration]
+
<li>[https://hallaweb.jlab.org/wiki/index.php/DVCS/RasterCalibration Raster calibration]</li>
 
+
<li>Go to empty target (you should already be there!), and call MCC to let them know we don't want beam anymore (they will run some tests of their own then). You're free to go...</li>
5) Move back to empty target, and call MCC to request controlled access. You're free to go...
+
</ol>

Revision as of 18:26, 1 October 2010

Back to DVCS

Start up run plan: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.


Friday Oct 1 Swing and Oct 2 Owl

  1. Compton rates with laser and beam scan (Eric will lead this study in the backroom)
  2. While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong
  3. BPM calibration
  4. Raster calibration
  5. Go to empty target (you should already be there!), and call MCC to let them know we don't want beam anymore (they will run some tests of their own then). You're free to go...