Difference between revisions of "Online analysis: results and pending"

From Hall A Wiki
Jump to: navigation, search
(Matching data taking with run plans)
Line 4: Line 4:
  
 
=Matching data taking with run plans=
 
=Matching data taking with run plans=
 +
* Update the how to
 
* Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
 
* Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
 
+
* Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
 +
* Establish history of the data taking against the boiling test
 +
* Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
  
 
=LHRS commissioning=
 
=LHRS commissioning=
  
 
=DVCS Calorimeter=
 
=DVCS Calorimeter=

Revision as of 18:41, 10 October 2010

Back to DVCS

This page is in progress, please contribute to it.

Matching data taking with run plans

  • Update the how to
  • Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
  • Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
  • Establish history of the data taking against the boiling test
  • Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal

LHRS commissioning

DVCS Calorimeter