(Matching data taking with run plans)
(LHRS commissioning)
Line 11: Line 11:
  
 
=LHRS commissioning=
 
=LHRS commissioning=
 +
* Calibrate the ADCs of S1 and the pion rejector
 +
* Calibrate detector time spectra: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]]
  
 
=DVCS Calorimeter=
 
=DVCS Calorimeter=

Revision as of 18:43, 10 October 2010

Back to DVCS

This page is in progress, please contribute to it.

Matching data taking with run plans

  • Update the how to
  • Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
  • Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
  • Establish history of the data taking against the boiling test
  • Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal

LHRS commissioning