Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→LHRS commissioning) |
|||
Line 6: | Line 6: | ||
* Update the how to | * Update the how to | ||
* Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged | * Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged | ||
− | |||
* Establish history of the data taking against the boiling test | * Establish history of the data taking against the boiling test | ||
* Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal | * Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal | ||
Line 31: | Line 30: | ||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
− | * LHRS optics run no sieve | + | * LHRS optics run (no sieve/sieve) |
− | * | + | * Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan |
+ | * Define goals of analysis | ||
+ | * carry on analysis | ||
+ | |||
+ | |||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Revision as of 19:00, 10 October 2010
Back to DVCS
This page is in progress, please contribute to it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Establish history of the data taking against the boiling test
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
Luminosity, efficiency
- Boiling test:
Still to be done : Analyze data of the boiling test, conclude
- Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
LHRS commissioning
- Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
- Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
- LHRS optics run (no sieve/sieve)
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Define goals of analysis
- carry on analysis