Line 26: | Line 26: | ||
* Calibrate detector time spectra: | * Calibrate detector time spectra: | ||
Still to be done : understand timing spectra for S1,S2 and the Cerenkov | Still to be done : understand timing spectra for S1,S2 and the Cerenkov | ||
− | |||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
Line 33: | Line 32: | ||
* Define goals of analysis | * Define goals of analysis | ||
* carry on analysis | * carry on analysis | ||
− | |||
− | |||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Revision as of 19:03, 10 October 2010
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
Luminosity, efficiency
- Boiling test:
- Establish history of the data taking against the boiling test
- Analyze data of the boiling test, conclude
- Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
LHRS commissioning
- Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
- Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
- LHRS optics run (no sieve/sieve)
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Define goals of analysis
- carry on analysis