Commissioning Run Plan

From Hall A Wiki
Revision as of 15:23, 6 October 2014 by Vasulk (Talk | contribs)

Jump to: navigation, search

For the Fall of 2014 assume:

  • max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.

Commissioning/ Calibration