Wednesday, Mar. 02: SWING Shift

From Hall A Wiki
Revision as of 13:30, 2 March 2016 by Parkkj (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations

Specific mission

  • Note1: Production Run
  • Set up the beam through Compton chicane
  • Detailed instructions here

Upcoming event

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++