Wednesday, Mar. 02: SWING Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
- General considerations
Specific mission
- Note1: Production Run
- Set up the beam through Compton chicane
- Detailed instructions here
Upcoming event
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++