Online analysis: results and pending
From Hall A Wiki
Back to DVCS
This page is in progress, please contribute to it.
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Establish history of the data taking against the boiling test
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
LHRS commissioning
- Calibrate the ADCs of S1 and the pion rejector
- Calibrate detector time spectra: [t0 for VDC (done 10-09)]