Documents for 2012 Production Run
- COO : Conduct of Operations (updated 01/10/2012).
- ESAD : Experiment Safety Assessment Document (updated 01/10/2012).
- Brief Hazard Awareness for RadCon group and ARMS (updated 10/18/2011).
- Safety guidelines for Radiation Surveys (updated 10/18/2011).
- RSAD : Radiological Safety Analysis Document.
- Polarized Target Primer for shift workers (updated 10/18/2011).).
OSPs & THAs
- Polarized Target.
- BigBite power supply.
- HKS Power Supply
- Septum Magnet
- FZ Magnets.
- Septa TOSP.
- Hall A Platforms,
- Local Dump Access Cover Sheet
- Local Dump Access
- 3rd Arm
- 3rd Arm Task Hazard Analysis
- Beamline systems.
- Chicane moving mechanism.
- Pre Beam Checklist
Documents for December 2011 Commissioning
Notes
- All documents are in draft state.
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- The source files for all g2p documents are available here.
- The SANE experiment Documentation for reference.
- JLab Template for the COO.