G2p documentation

From Hall A Wiki
Revision as of 11:17, 1 March 2012 by Slifer (Talk | contribs) (Operational Safety Procedures (OSP))

Jump to: navigation, search

All information from the 2012 Safety Review is here

Operational Safety Procedures (OSP)

Doc# Title link
ENG-11-035.OSP Procedure for ... FZ Magnets and FZ Power Supplies OSP
PHY-11-037.OSP Safe Operation of the Big Bite Power Supply OSP
PHY-11-036.OSP Safe Operation of the HKS Power Supply OSP
PHY-11-038.OSP Septum Magnet Commissioning, Operation, and Troubleshooting OSP
PHY-11-046.OSP Hall A Slow Raster OSP
PHY-11-047.OSP Hall A Tungsten Calorimeter Operation OSP
ACC-12-006.OSP FZ #2 Magnet, Magnet Arms, and Girder Adjustments (in review) OSP
PHY-12-008-OSP Operation of solid polarized target in Hall A OSP
(in review) G2P 3rd Arm Access OSP
(in review) G2P Beam dump insert extraction OSP

Supporting Documents

Title link
RSAD : Radiological Safety Analysis Document (in review) doc
Radiation Damage Doses to Septum Coils During g2p pdf
COO : Conduct of Operations (updated 2/4/12) pdf
ESAD : Experimental Safety Assesment Document (updated 2/4/12) pdf
Polarized Target Primer pdf
Hazard Awareness & Safety Guidelines pdf pdf
Pre Beam Checklist docx
December Commissioning TOSP
Septa Field Mapping TOSP

Notes