Monday, April 30, 2012 4:00pm

From Hall A Wiki
Revision as of 17:08, 30 April 2012 by Crowder (Talk | contribs)

Jump to: navigation, search

Agenda

  • Detector work to be completed before next collaboration meeting
    • detector geometry into mollersim
    • standalone optics simulations for quartz
    • other new work that could be presented by the collaboration meeting
  • How to divide simulation work
    • Peiqing - put in detector geometry and work on detector class(es?) including optical constant messengers, etc.?
    • Jon - stand-alone code with results double-checked in mollersim?


Minutes

  • Detector work to be completed before next collaboration meeting
    • detector geometry into mollersim (Peiqing)
    • development of detector classes (Peiqing)
    • standalone optics simulations for quartz benchmarked against PREx (Jon)
  • Design issues:
    • shape of lightguide
    • shape of quartz
    • placement of quartz
  • Simulation issues:
    • structure of simulation
    • parameterization so that changes can be easily accommodated



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005