For the Fall of 2014 assume:

  • max 20 uA but for short times when it can go higher
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.

Commissioning/ Calibration