Commissioning Run Plan
From Hall A Wiki
Revision as of 15:23, 6 October 2014 by Vasulk (Talk | contribs) (New page: For the Fall of 2014 assume: <ul> <li>max 20 uA but for short times when it can go higher <li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014...)
For the Fall of 2014 assume:
- max 20 uA but for short times when it can go higher
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.