Wednesday, Mar. 02: SWING Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
- General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam through Compton chicane
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++