D2n Target Operator Check List

From Hall A Wiki
Revision as of 23:55, 9 February 2009 by Yqiang (Talk | contribs) (New page: Target Operator Should Go Through This check list for every shift. == Every Half Hour == * Pumping Laser Absorption Spectrum == Every 2 Hour == * Check Cell Temperature * Check Oven Temp...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Target Operator Should Go Through This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum

Every 2 Hour

  • Check Cell Temperature
  • Check Oven Temperature

Every 4 Hour during 3He production

  • Do NMR Frequency sweep in between two production runs

Every Shift

  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Cell Temperature Reading (Optional/Automatic)
  • Screen Shot Oven Temperature Reading (Optional/AUtomatic)
  • Screen Shot of Holding Field Current (Optional/Automatic)

After Call for Beam to MCC

  • Check Raster Size
  • Check Beam Current
  • Check Trigger Rate