August 20th 2021
From Hall A Wiki
- Updates
- HCal
- analog sum setup using for cosmics
- DAQ running, can see pulses in data
- still take a day or so to check out everything
- can take cosmics to have things set up as in Test Lab
- software setup
- Bigbite Shower
- finished all cabling signal and HV and trigger monitoring, cosmics paddle cabling and labeling
- scalers : all supplies to make the special cables, need to make sure not to forget remove terminator on scaler
- can see signal from the cosmics trigger - cosmics
- mapping check on detector side
- moving from front end to bunker for mapping check - only one mistake found so far
- continue checks and turn one layer at a time and look at individual signals
- HV can be controlled with HV GUI
- cosmics calibration
- Mark set up cosmics trigger, if someone need to use it coordinate with Mark
- cables on table - used to look at trigger rates
- odd thing with scaler rates : sum much higher than individual sum of channels
- Provokar will check offset of the analog fan - to see where the threshold can be set
- Cable for threshold for DAQ - still need to be installed - 50 meters might be long enough for that
- Bigbite Hodoscope
- HV just setup thanks to Steve
- LV : were thinking combined voltage with GRINCH but did not work out to have both for GRINCH and hodoscope, so need another supply, Jack ordered another supply
- cabling : need extension on TDC cables - next week
- can start looking at signals straight from PMTs
- all cables laid out
- GRINCH
- good progress
- GRINCH fully cables
- HV cables and on
- checking all signals, 3 BNC head need to be fixed for ADC, most signals look good
- powered HV incrementally : most TDC channels are working
- need to replace 2 NINO cards
- some boards cannot reach 5V
- hodoscope using older version
- can use spares - old version found by Rachel - she is shipping it
- checking mapping of detector
- scalers display working in the bunker in bbhodo account
- still need to try to run CODA
- LHRS
- CDet
- GEM INFN Test Lab
- RF time
- HV
- Scalers
- EPICS
- Helicity
- start / stop / EPICS scripts
- HCal
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
- Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN
- documentation of VME crate names to power cycle - [[1]]- need to make sure all VXS are in dhcp -Bryan
- 3 rd GEM VXS crate install router moved up ( 100% )
- need power and network in GEM bunker ( done )
- boot VME controllers (100 % done - need ask hostname TS crate )
- TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- detector cabling
- new MPD production - about to start - FPGA shipped to Paolo -
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
- need to install remote switch for crate in bunker - rest are VXS or VME64 -
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
- TS setup - 50 %
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
- HCAL cabling
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ?
- Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run
- Cosmics trigger ( Bogdan ? 0 %) -
- Cosmics HCAL
- Cosmics Shower
- Cosmics Hodoscope
- Test 10 gig link to DAQ to adaq1
- EPICS script -
- alarm handler (David)
- Outstanding issues
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
- need to adjust for HCAL transit time with different PMTs
- status of cosmics paddles ( installed by Bogdan )
- GEM fibers too short : Mark will order parts - need to check status of order
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box for BB side