G2p documentation
From Hall A Wiki
- COO : Conduct of Operations.
- ESAD : Experiment Safety Assessment Document.
- Brief Hazard Awareness for RadCon group and ARMS.
- Safety guidelines for Radiation Surveys.
- Guidance for Surveys in Hall A during the g2p experiment.
- RSAD : Radiological Safety Analysis Document.
- Polarized Target Primer for shift workers (draft).
OSPs
- Polarized Target.
- Septa, HKS and Bite-1.doc BigBite power supplies.
- OSP for FZ Magnets.
- TOSP for Septa field mapping.
- OSP(s) for Hall A Platforms,
- Local Dump Access Cover Sheet
- Local Dump Access
- 3rd Arm(1) 3rd Arm(2)
- OSP for Beamline systems.
- OSP for chicane moving mechanism.
- Pre Beam Checklist
- HKS Power Supply
- Septum Magnet
Notes
- All documents are in draft state.
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- The source files for all g2p documents are available here.
- The SANE experiment Documentation for reference.
- JLab Template for the COO.