G2p Safety Readiness Review

From Hall A Wiki
Revision as of 19:41, 4 February 2012 by Slifer (Talk | contribs) (Finalized Documents)

Jump to: navigation, search

Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Comments/Suggestions from the committee are posted here

Draft Response here (last update 2/2/2012)

Specific response from B. Dillon-Townes here

Review Agenda

January 17, 2012; JLab F225, 1:00-5:00 pm

Time Topic Presenter
1:00 - 1:20 Introduction/Overview J. P. Chen
1:20 - 1:40 Polarized Target update (short-note) C. Keith
1:40 - 2:00 g2p/GEp Beamline T. Michalski
2:00 - 2:20 Beamline runorbits Y. Roblin
2:20 - 3:00 Break
3:00 - 3:20 Engineering, Design & Field Mapping R. Wines
3:20 - 3:40 Hall A Installation, Mechanical Structures E. Folts
3:40 - 4:00 Radiation Control P. Degtiarenko
4:00 - 4:20 Radiation Damage (updated 1/27/2012) Dose Rates from Local Dump G. Kharashvili
4:20 - 4:40 Experiment Preparation K. Slifer
4:40 - 5:00 Discussion

Finalized OSPs

Doc# Title link
ENG-11-035.OSP Procedure for ... FZ Magnets and FZ Power Supplies OSP
PHY-11-037.OSP Safe Operation of the Big Bite Power Supply OSP
PHY-11-036.OSP Safe Operation of the HKS Power Supply OSP
PHY-11-038.OSP Septum Magnet Commissioning, Operation, and Troubleshooting OSP
PHY-11-046.OSP Hall A Slow Raster OSP
PHY-11-047.OSP Hall A Tungsten Calorimeter Operation OSP

Documents in Review

Doc# Title link
ACC-12-006.OSP FZ #2 Magnet, Magnet Arms, and Girder Adjustments (in review) OSP
G2P 3rd Arm Access (in review) OSP THA
RSAD (in review) doc
Polarized Target OSP (in review) OSP
G2P Beam dump insert extraction OSP THA


Supporting Documents

Title link
Conduct of Operations (COO) pdf
Experimental Safety Assesment Document (ESAD) pdf
Polarized Target Primer pdf
Hazard Awareness & Safety Guidelines pdf pdf
Pre Beam Checklist docx
December Commissioning TOSP
Septa Field Mapping TOSP



Notes