Monday, April 30, 2012 4:00pm

From Hall A Wiki
Revision as of 15:31, 30 April 2012 by Crowder (Talk | contribs) (New page: == Agenda == * Detector work to be completed before next collaboration meeting ** detector geometry into mollersim ** standalone optics simulations for quartz ** other new work that could...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

  • Detector work to be completed before next collaboration meeting
    • detector geometry into mollersim
    • standalone optics simulations for quartz
    • other new work that could be presented by the collaboration meeting
  • How to divide simulation work
    • Peiqing - put in detector geometry and work on detector class(es?) including optical constant messengers, etc.?
    • Jon - stand-alone code with results double-checked in mollersim?


Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005