Wednesday, October 9, 2013 2:00pm EST

From Hall A Wiki
Revision as of 14:19, 9 October 2013 by Crowder (Talk | contribs) (Minutes)

Jump to: navigation, search

Last group meeting: Wednesday, June 12, 2013 10:30am EST
Last meeting: Monday, October 7, 2013 2:00pm EST

Agenda


These presentations may be updated right before the meeting

  1. Status of the engineering work
    1. Update from Jason on support structure .pptx .pdf
      backup:
      presentation from June
      Tyler's interference slides
    2. Update from Jim on vacuum vessel .pptx .pdf
  2. Update on the physics/optics work
    1. Update from Juliette on iron simulations .pptx .pdf

Minutes

Attending: Juliette, Robin, Stanley, Jim, Jason, Jay, Kent, KK, Thia, Javier

  1. Status of the engineering work
    1. Update from Jason on support structure
      1. green and blue are Al strongbacks; pink blocks are Al with coil
      2. slide 7 doesn't include bolted connections
      3. Slide 9 Questions:
        Could top piece be an I-beam? - Needs strength in both directions.
        Is this assembly made and then assembled? - yes - coil is pre-assembled with carrier.
    2. Update from Jim on vacuum vessel
  2. Update on the physics/optics work
    1. Update from Juliette on iron simulations