These presentations may be updated right before the meeting
- Status of the engineering work
- Update from Jason on support structure .pptx .pdf
backup:
presentation from June
Tyler's interference slides - Update from Jim on vacuum vessel .pptx .pdf
- Update from Jason on support structure .pptx .pdf
- Update on the physics/optics work
Minutes
Attending: Juliette, Robin, Stanley, Jim, Jason, Jay, Kent, KK, Thia, Javier
- Status of the engineering work
- Update from Jason on support structure
- green and blue are Al strongbacks; pink blocks are Al with coil
- slide 7 doesn't include bolted connections
- Slide 9 Questions:
- Could top piece be an I-beam? - Needs strength in both directions.
- Is this assembly made and then assembled? - yes - coil is pre-assembled with carrier.
- Slide 10 Questions:
- Isn't ~1mm too big? Comparison is between clamped vs. 6 strut. But aren't they both too big? Small perturbation and sensitivity study (not completed yet) seems to indicate that this would be okay. Also doesn't include the other braces - just has carrier and coil.
- Why strut - why not another support structure? Takes more alignment...
- Update from Jim on vacuum vessel
- Update from Jason on support structure
- Update on the physics/optics work
- Update from Juliette on iron simulations