Wednesday, October 9, 2013 2:00pm EST

From Hall A Wiki
Revision as of 14:28, 9 October 2013 by Crowder (Talk | contribs) (Minutes)

Jump to: navigation, search

Last group meeting: Wednesday, June 12, 2013 10:30am EST
Last meeting: Monday, October 7, 2013 2:00pm EST

Agenda


These presentations may be updated right before the meeting

  1. Status of the engineering work
    1. Update from Jason on support structure .pptx .pdf
      backup:
      presentation from June
      Tyler's interference slides
    2. Update from Jim on vacuum vessel .pptx .pdf
  2. Update on the physics/optics work
    1. Update from Juliette on iron simulations .pptx .pdf

Minutes

Attending: Juliette, Robin, Stanley, Jim, Jason, Jay, Kent, KK, Thia, Javier

  1. Status of the engineering work
    1. Update from Jason on support structure
      1. green and blue are Al strongbacks; pink blocks are Al with coil
      2. slide 7 doesn't include bolted connections
      3. Slide 9 Questions:
        1. Could top piece be an I-beam? - Needs strength in both directions.
        2. Is this assembly made and then assembled? - yes - coil is pre-assembled with carrier.
      4. Slide 10 Questions:
        1. Isn't ~1mm too big? Comparison is between clamped vs. 6 strut. But aren't they both too big? Small perturbation and sensitivity study (not completed yet) seems to indicate that this would be okay. Also doesn't include the other braces - just has carrier and coil.
        2. Why strut - why not another support structure? Takes more alignment...
    2. Update from Jim on vacuum vessel
  2. Update on the physics/optics work
    1. Update from Juliette on iron simulations