Commissioning Run Plan
From Hall A Wiki
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
Pre-beam Checklist
Trigger Checkout (Experts)
* Checkout trigger timing * Checkout of EDTM (Barak Schmookler) * Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers. This has been found to be a robust method for determining electronic deadtime
in Hall C and we should think about adding something similar for GMP.