Wednesday, Mar. 02: SWING Shift

From Hall A Wiki
Revision as of 13:23, 2 March 2016 by Parkkj (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations

Specific mission

  • Note:
  • Detailed instructions here


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++