Wednesday, Mar. 02: SWING Shift

From Hall A Wiki
Revision as of 13:39, 2 March 2016 by Parkkj (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  • Need shift crews for future


Specific mission

  • Production Run
  • Set up the beam through Compton chicane


Upcoming event(Short Term)

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access)
1/ Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog (327-5523) : <1hr
3/ Compton : check laser profile : <1hr


Upcoming event(Long Term)

  • BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
  • Target boiling test 30uA(60 ideal)
  • Detailed instructions

BCM DOC1DOC2


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++