Friday, Mar. 04: DAY Shift

From Hall A Wiki
Revision as of 09:41, 4 March 2016 by Parkkj (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production run ?



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off

2/ Back to production mode


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++