Friday, Mar. 04: DAY Shift

From Hall A Wiki
Revision as of 11:59, 4 March 2016 by Parkkj (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production runs (YES!!)



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 
- Experts on call (Julie)
- Calo. HV off

10:50AM (snap shot of BCM)
Image: hac_bcm_average

Instruction: DOC1DOC2

2/ Back to production mode


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++