Wednesday, June 8, 2016 1:30pm EST
From Hall A Wiki
Last meeting: Thursday, April 14, 2016 11:00am EST
Agenda
- Javier's Pre-project Planning document, due soon (A-C3)
☑ List of major subsystems
☑ List of subsystems of each major system
☑ Persons responsible for each subsystem
☑ Schematic/list of subsystem cartoon
□ Estimate cost as well as possible (cite source: manufacturer, previous purchases, machine shop work, catalog, etc.) January 2016 Table
□ Labor estimate Labor
- Javier's Pre-project Planning document Labor and Timeline (C4-C5)
□ Packaging and shipping costs and timeline
□ Work timeline
□ Time for funds to come in
□ Procurement times
- Javier's Pre-project Planning document (C6 - L2 manager compiles information)
□ Procurement Profile
□ Labor Profile
□ Timeline for contracts, hiring, funds transfers
□ Cost and Risk
Cameron's MOLLER CAD to-do list
Minutes
Attending: Juliette, KK, Seamus, Cameron, Tyler, Rakitha, Jim
- Cameron's slides
- PMT shield
- moveable collimators
- between inner photon collimator and acceptance defining collimator (20 cm)
- concrete shield is downstream
- won't need to be cooled
- one, both, none
- upstream vacuum chamber not designed yet
- update e- and gamma envelopes
- "fix" detector locations
- Sakib has a script that writes the detectors
- shielding def'n into CAD
- Rakitha will make sure repository updated
- Seamus and Tyler will work to import into CAD
- Jim can put shielding into CAD as well
- Pre-planning document
- schematic - Jim, Jason and Ernie will go over this carefully
- cost - document okay for first iteration
- vacuum chamber - budgetary bids
- coils - just did a larger conductor version (may be at little cheaper)
- 3 custom size conductor - eliminated interferences
- need multiple power supplies
- checked large versus small conductor as a second check
- labor
- Jim will look at it
- preassembling everything at MIT
- vacuum boxes?
- full current test somewhere (MIT or JLAB)
- map the fields
- rent chiller
- power supplies
- Need more design work to produce engineering documents
- testing prototype coils doesn't count in this costing/manpower exercise
- long lead time items
- re-baseline with larger conductor
- get dimensions into TOSCA
- simulate with new fields and make new envelope
- recheck envelopes
- Survey meeting in July
- Robin, Jim, KK
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005