Quad Tuning 1pass 48d
From Hall A Wiki
Procedure without Sieve-slit
- Q1 currents need to be updated!
- Time estimate: 1-2 hours
* Take a run at the following kinematics without the sieve-slit collimator. * Start with initial HRS spectrometer tunes for the left and right arms with the new quads in place of Q1s. * If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure. * Electron rates assume 9 carbon foils, 5 mSr acceptance, and 8% delta acceptance. * A GMp expert will check the data quality and decide, if the HRS tunes need to be adjusted to change the size of the acceptance. * This process will be repeated until the spectrometer tune is satisfactory.
- Right-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Q2 [GeV2] | W [GeV] | Rate [Hz] at 20 μA | minutes for 71k events at 20 μA |
2.217 | 0.85 | 48.75 | 1.28 | 1.47 | 119 | 10 |
We want to take runs with the following Q1 currents:
- 0%: 173.825 A
- -10%: 156.443 A
- -5%: 165.134 A
- -2%: 170.349 A
- +2%: 177.302 A
- +5%: 182.516 A
- +10%: 191.208 A
Left HRS Quad Tuning Plan (Already completed)
Right HRS Quad Tuning Plan (Only if right HRS magnets are working)