TDIS Bi-monthly meeting, 2018 January 16

From Hall A Wiki
Revision as of 18:50, 16 January 2018 by Marcoapc (Talk | contribs) (Minutes)

Jump to: navigation, search

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting


Organizational details

11:00 AM, JLab meeting room: CC A110


To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940

Agenda

  • MRI preparations for mTPC/TDIS

Minutes

Notes from Marco

  • Note that we anticipated the meeting from next week to discuss MRI now, as the MRI deadline is coming soon (so no meeting will be February 13)
  • MRI preparation - Nilanga update
    • Institutions: UVA (leading), Hampton U., Virginia Union U., JLab
    • Deadlines:
      • NSF deadline: February 05, 5pm (Monday)
      • Our (tentative) submission deadline: February 02 (many institutions involved, safe to try to submit earlier)
      • Our proposal ready deadline: January 26 (so we can prepare for submission)
    • Budget goal:
      • Try to keep under U$1M (track 1 proposal) - otherwise more requirements are needed
    • C1 condition:
      • Our C1 constrain will be addressed - change from a radial TPC to a multiple TPC
      • PAC report: C1 is related to detector feasibility, not DAQ
      • Our current analysis show that the detector is possible
      • C1 cannot be lifted in time for the MRI - requires to form a committee, write details (2 weeks is not enough for all that)
      • Although the experiment is with C1, we should highlight that it was A-rated
      • We could ask a letter from the DAQ or the electronics group emphasizing that the detector can be built
    • Proposal preparation:
      • Nilanga has first draft already - need now feedback from people
      • We should highlight that the PAC approved the science, we have days allotted for the experiment, the rating was given
      • Thia can write as a Hall leader about schedule if needed
      • There has been a very broad program on TDIS discussed for the EIC, like what we are doing - several workshops already happened