Spring 2019 Compton Photon Detector Commissioning
- Before MCC begins the initial process of passing bream through the Chicane, we must:
- Check and set HV:
- PhDet HV -> OFF
- Side (V) and Top (H) Finger Scintillator -> ON
- Laser table scintillators -> ON
- The following EPICS channels may be useful to monitor the backgrounds
- ComptonUSbg1
- ComptonUSbg2 <-- It's possible this one is unplugged
- ComptonDSbg1
- ComptonDSbg2
- The following EPICS values may also be useful
- hac_bcm_average
- IPM1P02A.XPOS
- IPM1P02A.YPOS
- IPM1P02B.XPOS
- IPM1P02B.YPOS
- Optionally the two finger scintillators may be useful, though it's likely they won't see anything if they are behind the collimator
- ComptonHfingerRate
- ComptonVfingerRate
- It may be useful to take a run during this period. Even though the HV on the detector is off, we may use it to study noise on the system.
- Check and set HV:
- After the beam is stable in the chicane and ready to center beam on laser
- Check and set HV:
- PhDet HV -> ON
- Side (V) and Top (H) Finger Scintillator -> ON
- Start a Compton Run (though, no need to analyze the run right now, this will just help us commission and calibrate the DAQ later)
- With the laser ON and 'not flipping, monitor the following EPICS channels:
- IPM1P02A.YPOS
- IPM1P02B.YPOS
- ComptonCentralRate
- ComptonCentralRateHigh
- COMPTON_PW1PCAV_ca
- As the beam is scanned vertically monitor for spikes in ComptonCentralRate and ComptonCentralRateHigh.
- The goal is to maximize ComptonCentralRate (assuming stable beam and laser power) and record the vertical position
- Ideally we would like the slope between BPM 02A and 02B to be as close to zero as possible
- Check and set HV:
- After the beam is centered on the laser, ask MCC to lock the beam in the optimal position found previously and then begin the detector centering procedure
- Check and make sure all HV Compton channels HV_Control_GUI are ON (should have been done by steps above, so just confirm nothing has tripped off)
- Center the detector vertically
- Set the Photon Detector table to X=