March 12th 2021
From Hall A Wiki
- Updates
- HCAL
- setting up summing modules - have all fan in / out modules - all channels
- Juan Carlos wrote library for DAQ
- setup LED system to measurem attenuation : Sebastian running the DAQ
- Bigbite Shower
- setting up trigger monitoring system
- working on cabling
- V1495 DAQ for shower / preshower
- Provokar taking data - debugging pedestal issues
- will get FADC from NPS , Steve checking with Chris
- Bigbite Hodoscope
- debugging : one offset moving around on different NINO channel, might be a problem with cable - will continue taking data - BNC was checked but did not help - ADC cable to V792 replaced fixed issue ( label cable with issue and try to fix it )
- want data combined Shower with Hodoscope ( for preshower especially ) : adding fibers to run hodoscope and shower together , will need CODA config and decoder to have both in the tree - Setting TS crate for Fastbus with Fast clear
- readout list should still be on sbs1 or sbs2 ( was used for ECal 1881 )
- GRINCH
- working moving analysis script in SBS-online, almost ready to test the script
- CDet
- everything back up running - taking cosmics everyday and debugging / troubleshooting
- INFN GEM
- DAQ not back running yet, will set trigger and electronics
- borrowing SD board from INFN clean room for TS crate
- ordering SD with INFN money for replacement
- UVA clean room
- still noise issue due to grounding
- construction work going in clean room interfering, will continue next week
- TEDF
- connecting GEM, almost have GEM in CODA DAQ and will take pedestal next Monday, allow to look at noise
- Low voltage supply on network - need additionnal ports - will add dumb switch for low speed devices
- LHRS
- VDC running with FADC for scintillators - can analyse data
- ATOM board for testing in HRS - still need to setup Centos 7 - will look at BigBite setup next week first
- HCAL
- Data rates