April 9nd 2021

From Hall A Wiki
Revision as of 11:19, 9 April 2021 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL ***still working of F1 with external clock ***still need 1 FADC, will check FADC ***patch panel for DAC, design done - will design GUI to control thresholds **...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Updates
    • HCAL
      • still working of F1 with external clock
      • still need 1 FADC, will check FADC
      • patch panel for DAC, design done - will design GUI to control thresholds
      • 60 cables for overlapping sum , 40 out of 60 done by Mindy
    • Bigbite shower
      • Bigbite weldment not moved, will move crates instead of weldment
      • two more students joining
      • trigger monitor fully cabled , ready to be looked at
      • FADC side cabling done, cabling front end to BNC patch panel - will take FADC data
    • Bigbite hodoscope
      • taking data
      • new trigger setup
      • gain matching on-going
      • plan for move in hall
    • GRINCH
      • tested LED, seems working
      • taking cosmics data with large scintillator and small scintillator - taking a run right now
      • need ADC
    • LHRS
      • LHRS detector installed
      • working on Centos 7 upgrade
    • GEM TEDF
      • found all issues , can run INFN GEM, 2 MPDs taken to electronics to add resistor to reduce pedestal shift
      • ready for SSP firmware update
    • GEM UVA
      • noone
    • CDet
      • taking cosmics
      • APS meeting poster by undergrad on CDEt during poster symposium by Taylor Edwards