May 14th 2021
From Hall A Wiki
- Updates
- HCAL
- work on decabling / move
- tried DVCS pulser but need to go through regular gate generator
- move to May 24th
- HCal move prep slides: pdf
- BB Shower
- will start decabling on Monday
- FADC with a bad channel - move to another channel - block working ok - Eric will bring bad FADC to Bill Gunning
- Mark working on the F1 - not sure if he has right library - Bryan will have a quick look at setup
- BB Hodoscope
- still taking data
- waiting next week to start decabling
- GRINCH
- Will seal the door today without testing a new pulser first, since the GRINCH will likely be inaccessible for a month in the hall.
- Leak checks and decabling next week.
- LHRS
- progress on cabling and looking at histogram
- talk on Monday for HRS status at main meeting
- bank numbering - same bank - max bank number -use same as Hall C - will make a table for the modules will put same bank number as module
- GEM INFN
- INFN and UVA GEM in TEDF took cosmics
- issue with DAQ - problem with HV on one INFN -killed one APV
- Sean did studies of common mode processing : looks same with sorting and Danning algorithm
- working on shielding of GEM before move
- other UVA for front tracking coming next week UV chambers
- GEM UVA : working on shielding of chambers
- HV
- EPICS controls working for MPOD wiener HV for UVA GEM
- INFN GEM has different HV - ordering more MPOD to have one single
- software : installation - adaqsc - slowc account - same password as adaq or a-onl
- need update updates start / end run scripts to use new HV - and epicslogger
- cannot ssh in rpi8 on LHRS ? might need to restart it or be on right subnet -Bob will send instructions to Steve
- Data moving
- Bob agreed to help set it up
- HCAL
- Move to Hall A
- weldment status
- still no answer from Jessie or Jack, but plan to be as close as possible to bunker - if cannot move in - will move racks
- need to make sure nothing loose on weldment so they don't fall
- hostnames to be transferred
- as soon as decabling start will ask to move Bigbite host to 192 subnet
- transfer software to counting house
- SBS-online status ? Most detector using SBS-online, maybe Grinch still working
- ET system for online ?
- people will install software while detector down
- weldment status
- Network : fibers started installation this , put new router next week