D2n Target Operator Check List
From Hall A Wiki
Revision as of 23:55, 9 February 2009 by Yqiang (Talk | contribs) (New page: Target Operator Should Go Through This check list for every shift. == Every Half Hour == * Pumping Laser Absorption Spectrum == Every 2 Hour == * Check Cell Temperature * Check Oven Temp...)
Target Operator Should Go Through This check list for every shift.
Contents
Every Half Hour
- Pumping Laser Absorption Spectrum
Every 2 Hour
- Check Cell Temperature
- Check Oven Temperature
Every 4 Hour during 3He production
- Do NMR Frequency sweep in between two production runs
Every Shift
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Cell Temperature Reading (Optional/Automatic)
- Screen Shot Oven Temperature Reading (Optional/AUtomatic)
- Screen Shot of Holding Field Current (Optional/Automatic)
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate