D2n Target Operator Check List

From Hall A Wiki
Revision as of 23:56, 9 February 2009 by Yqiang (Talk | contribs)

Jump to: navigation, search

Target Operator Should Go Through This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • Check Cell Temperature
  • Check Oven Temperature

Every 4 Hours during 3He production

  • Do NMR Frequency sweep in between two production runs

Every Shift

  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Cell Temperature Reading (Optional/Automatic)
  • Screen Shot Oven Temperature Reading (Optional/AUtomatic)
  • Screen Shot of Holding Field Current (Optional/Automatic)

After Call for Beam to MCC

  • Check Raster Size (4x4, 4x5.2 MCC)
  • Check Beam Current (4uA)
  • Check Trigger Rate