September 3rd 2021
From Hall A Wiki
- Updates
- HCal
- new TI swapped
- all fibers connected
- Bryan will make the HCal config
- TDC reference time working now
- extra FADC with copy of trigger ( reference ) ( make sure the shaper is in and it is the good one ) , 10 supercluster analog sums - might need different latency for the reference time
- need to check linear fan/in for offsets
- need double check no capacitive coupling in wrong place
- might need to add capacitor on some channels if needed
- 10 ns cable extension to JLab PMTs - clusters line up better
- can check with LED, but LED not yet ready
- is there air flushing on PMT ? Not
- Bigbite Shower
- finished pulser test for shower and preshower
- HCal
(look up table of ratios : some modules have isses in shower and still investigating preshower )
- could not find any linear fan in/out - need check to Bogdan or Jack
- might be modules in LHRS that might not be in used
- connected cables from BB discrimator to HCAL DAC, threshold can be changed remotely
- installing 2 FADCs in hodoscope crate for sum monitoring
- one FADC channel was not working 1-4 - will remove FADC to be repaired
- coincidence trigger : can work with Bob and Scott today - pulser ready
- continue to debug and take cosmics overnight
- need clean up area
- all scalers plugged and to F1 - some features in TDC might be odd
- need FADC trigger cables
- Bigbite Hodoscope
- noise issue figured out
- could take data with DAQ and troubleshooting
- 4 data runs at 4 different HV, of lower detector, next middle and upper third
- still couple of channels to check
- will try to add to full DAQ when not in use
- GRINCH
- setting up timing set up, using hodoscope trigger - signal was too long - shorten cabled - ADC gate working
- everything reading out - some decoding issue - to look at the data
- OSP submitted to work on upper half of detector - all ADC channels working
- few TDC/ PMTs
- LHRS
- no major updates
- waiting for cables
- will try with TS
- different modes : running mode with and with fastbus
- Bryan tried run slave config
- CDet
- GEM BigBite
- took*
- RF time
- need add TDC
- HV
- Scalers
- need cabling
- need work on readout
- need one SIS set to 3801 for helicity, rest 3800
- G0 scalers than can be used for detectors - need width at least 10 ns as input
- FADC for BPM/raster + helicity signal
- can add readout list
- 3820 cannot get it to work so far, will take it out - and work on it in TEDF
- Recoil polarimeter
- EPICS
- BCM
- plugged signal in analog receiver for upstream - 30 uA - will check signal in counting house
- DAC input for VtoF
- digital receiver - cable should still be connected as before
- Helicity
- erverything plugged in LHRS - still need L1A patch to scaler
- code merged to readout list - can test it
- last piece of helicity scaler from TEDF to be ported over to LHRS
- finishing podd module for readout
- start / stop / EPICS script
- working on tedbbdaq for test setup
- will update scripts on adaq
- Helicity
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - should check when bunker is setup
- Scaler crate setup (90 % - Steve - need add readout) - Steve could not talk to CPU (done) - IP fixed with DHCP - need change fan tray - CAEN ( done )
- documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan ( done ) https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A
- 3 rd GEM VXS crate install router moved up ( 100% )
- need power and network in GEM bunker ( done )
- boot VME controllers (100 % done - need ask hostname TS crate )
- TS cables - all fibers plugged (done) - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- new firmware for LHRS TI -
- detector cabling ( 100 % - debugging )
- new MPD production - about to start - FPGA received by Paolo - need check when production starts
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A (done) - 5.2 KHz max trigger rate - 900 MB/s max per VTP - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver - need one more
- need to install remote switch for crate in bunker (done hareboot32) - rest are VXS or VME64 - need put CAEN crate on network
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - might be ok with current NIM crate
- TS setup - 90 % - all cabled - still need to configs
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David and Bob, Jack Heidi helping )
- HCAL cabling ( done )
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ( done )
- Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run (done )
- Cosmics trigger ( done ) -
- Cosmics HCAL ( ongoing )
- Cosmics Shower ( on going )
- Cosmics Hodoscope ( on-going )
- Cosmics Grinch
- Test 10 gig link to DAQ to adaq1 - 900 MB/s - will try with two VTP
- New computers have been installed - Main DAQ computer still not received -
- EPICS script -
- alarm handler (David) - still need to set up on adaqsc - check with Ole to have hacweb7 online and copy - need to make sure audio avalable for alarm
- Outstanding issues
- Issue with CAEN HV for Hodoscope with EPICS
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
1 more bad FADC on shower ( 1 channel bad )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) Hall B lending two - will get once checked
- need to adjust for HCAL transit time with different PMTs - looked at it already, about 12 ns - 20 cable after summing - still need to look with led
- status of cosmics paddles ( installed by Bogdan ) - HCAL paddles in test lab still need to be set up - Scott checked with techs - will push next week
- GEM fibers too short : Mark will order parts - ( fiber ordered - + 2 extensions ordered )
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit ( extension setup - 50 % )
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box for BB side ( got one from UVA )
- GEM LV remote control ( done )
- GEM VTP transceivers hanging - ( swapped with SSP - firmware fix will be implemented )
- SBS bunker cables
- fiber order
- test multiple event builder soon
- Status software in a-onl@aonl1
- GRINCH
- still need to install - need to check if commits were merged
- Shower
- installed
- GEM
- Andrew still need to set it up there
- Hodoscope
- installed
- HCAL
- setup and can look at data
- All crates
- want run GEM and shower
- readout list ready - just need CODA configs
- TS for V792 gate
- coincidence Shower and hodoscope in TS2 of GEM